Monthly Archive for February, 2009

The last stages of building


Above is a timelapse of the last day of official work (the video is a bit low quality).  We shipped the sets the day after and have set them up in the studio.  Karin (and possible Nancy, another builder) will be coming here in about a week to finish some of the houses, and survey the setup.

Below are some of the stills.

Warning: require_once(/home/sunit_parekh/ failed to open stream: Permission denied in /home/sunit_parekh/ on line 572

Fatal error: require_once(): Failed opening required '/home/sunit_parekh/' (include_path='.:/usr/local/lib/php:/usr/local/php5/lib/pear') in /home/sunit_parekh/ on line 572